Here are the minutes from this evening’s planning committee meeting.
Participants: Brad Ditton, Tom Burdette, Dan Rosenberg
- Next Steps
- Lot line adjustment if Marc puts down a deposit
- Draw the map for the parcel map (doesn’t have to be exact)
- Include Crossroads parcel
- includes phases (such 1-6)
- county will allow us to develop them in any order as long as the improvements required by the County are done for that parcel.
- Once the tentative parcel map is filed, we can start marketing parcels to developers
- Speak with Integrated Engineers about the storm water retention/detention and how much volume we need to detain
- Speak with Integrated Engineers about the wastewater treatment plant